Commercial
For timely updates on various projects please visit and follow us on instagram! @rjgiamba
-
Southport Crossing
Coming soon, please check back soon. -
Greenwich Country Club
We've had the pleasure of being invited back to the gcc multiple times over the last couple years to assist with Bathroom and Kitchen renovation's. -
The Basilica of St. John- Stamford, CT
Phase II of the center Altar restoration began with removing the existing marble Altar platform, framing, and installing new oak platform. The restoration continued with replacing broken marble floor pieces by fabricating new ones on site to match. Lastly, a full restoration of the marble Altar. For more information regarding this renovation please read the bulletin written by Monsignor DiGiovanni located in the press column. -
Nagi Jewelers- Stamford, CT
Removed the old stamped concrete and installed 24"x24" flamed granite entrance complete with new hand rails. -
South End Uncorked- New Canaan, CT
Complete restaurant make over with HGTV's Micheal Aesif. Our role in this make over included installing porcelain wood tiles on the kitchen floor, herringbone pattern on both walls leading out from the kitchen, and the concrete block for the bar top seating area -
Cognetta Funeral Home- Stamford, CT
We began working for the Cognetta family when they remodeled 15 years ago. We installed all of the granite flooring in the front and side entrance and hallway. In 2014, the Cognetta family has welcomed us back for another renovation. We removed the existing granite throughout the hallway and side entrance and prepared the subfloor. We made elevation corrections to ensure a level installation. The building itself is over 100 years old so this was not an easy task since there were so many additions added over the years. We installed the porcelain wood tile throughout the hallway, front and side entrance, office, and bathroom areas. -
Table 104- Stamford, CT
Renovated restaurant bar and dining areas to include a new wood burning pizza oven. Installed non slip tile behind the bar and pizza prep station. Removed all existing floor tile and poured a new concrete floor throughout the entire space. www.table104stamford.com -
The Basilica of St. John the Evangelist- Stamford, CT
Phase I of II for this alter restoration began with removing the existing marble rails and steps. Once the base of the columns, pulpit, and alter were exposed we reinforced any areas needing attention prior to installing the new hand crafted wood planks for the steps. The customized hand crafted base of the columns and hand rails were installed and stained to complete this first phase. -
Barcelona Restaurant- Fairfield, CT
Renovation included all new tile around the new bar area. New slate tile wall for writing their menu. Repair and replacement of broken floor and wall tile throughout kitchen. Removed old baseboard tile throughout kitchen and installed new sanitary baseboard tile to meet code. Tiled front entrance to accept recessed custom rug inlay. www.barcelonawinebar.com/fairfield.htm -
Belltown Hall- Stamford, CT (Belltown Fire Dept)
Full remodel and expansion of outdated his and her's restrooms to today's standards with ADA compliance. Subway tile throughout walls. -
Donut Delight- Stamford, CT (Hope St)
We first began with the exterior stucco which not only protects the building from the elements, but gives the building its final shape and designed appearance. Inside, we properly prepared the floors and walls before installing the tile in the bathroom, behind the service counter, rear kitchen, and main seating area. www.donutdelight.com